1
Total Applications
Building plan approval
General Instructions
To streamline the processes, reduce efforts and time for processing Building Plan Approval, Department of Housing & Urban Development, Government of Odisha has introduced the onlineBuilding Plan Approval System (BPAS). The application covers Common Application Form (CAF) and allows easy online submission, verification and approval from all concerned agencies through a single application form. As an online system, the BPAS can be accessed by any time anywhere. The software application enables the users to register, apply for a new building plan, make online payments and receives approval online.
User Type |
Description |
Access Point |
Citizen |
Users who want to apply for building plan approval for commencement of building. |
a) Apply CAF online
b) Track status online
c)Online payment of fees
d) Download certificates
|
Technical Person |
Architects, Civil Engineers etc. who will apply for Building Plan & Occupancy to the Authority |
a)Download BPAS client utility
b)Prepare AutoCAD drawing file
c)Apply CAF online
dTrack status
e)Online payment of fees
f)Download certificates
|
Checklist of Documents
i) Self signed Ownership document
ii) Copy of certificate of registration of Architect
iii) Plan details
iv) Affidavit
v) Photographs of the sites
Timeline
Building Permit for Low Risk Buildings is provided within 15 working days from the date of receipt of complete application. For all buildings other than Low Risk buildings, Building Permit is provided within 30 working days from the date of receipt of complete application. The department can however raise queries on the application within 7 working days of receipt of application.
Fees: Every application submitted for building operation or development, under rule 3 shall be accompanied by fees as specified in the Table below:
SL |
Detail of Construction and Area |
Fee in |
(1) |
(2) |
(3) |
(A) |
Fee for development of land |
Rs 5.00 per square |
(B) |
Fee for building operation |
|
|
(i) For residential building (covered area on all floors) |
|
(a) Upto 100 square meters |
Rs. 250.00 |
(b) Above 100 square meters and upto 300 square |
Rs. 150 per |
SL |
Detail of Construction and Area |
Fee in |
|
|
square meter |
(c) Above 300 square meters |
Rs. 10.00 per square meter |
(ii) For Commercial building (Business, Mercantile, Shops , Hotels, Public Assembly Buildings, Show Rooms, Business Offices, Godowns, Warehouses, Banks, Cinemas, Theatre, Clubs etc. ) ( Covered Area on all floors) |
|
(a) Upto 20 square meters |
Rs. 500.00 |
(b) Above 20 and upto 50 square meters |
Rs. 50.00 |
(c) Above 50 square meters |
Rs. 20.00 per square meter |
(iii) For Industrial buildings (Covered area on all floors) |
|
(a) Upto 100 square meters |
Rs. 1500.00 |
(b) Above 100 and upto 300 square meters |
Rs. 25.00 per square meter |
(c) Above 300 square meters |
Rs. 15.00 per square meter |
(iv) For public buildings (Educational, Religious, Government, Local Bodies uses) (Covered area on all floors) |
Rs. 5.00 per square meter |
Inspection Procedure for obtaining Construction Permit
General Instructions
For Building Other than Low Risk Buildings
Step 1: On receipt of Common Application Form for building operations, the concerned Verifying Officer will do the scrutiny of uploaded documents for its correctness and completeness. After Scrutiny of the documents, the Verifying Officer will refer the same to the concerned public agencies for obtaining No-objection certificate before granting or refusing permission to the applicant.
Step 2: The concerned Verifying Officer of the Authority will generate a site inspection notice specifying a date and time to the public agencies for conducting a common Inspection Programme. Any Public Agency which needs to conduct field visit and inspection for giving No-Objection Certificate, shall conduct the same as part of such notified common inspection programme. The date provided by concerned Verifying Officer of the Authority shall be ten days after the receipt of Common Application Form by public agencies but it shall not exceed twenty days of receipt.
Step 3: The concerned nodal officer of public agency will be intimated with SMS and email for common Inspection programme. The common inspection programme shall be conducted on the said date and time mentioned in the site inspection notice.
Step 4: Inspection reports are to be uploaded by assigned nodal officers of public agencies within 48 hours of conduct of site inspection. In case, if any objection arises or further clarifications are required, the same shall be mentioned in the report.
Step 5: After receipt of Inspection report, if the information and document provided by the applicant has been complied and is to the satisfaction of the nodal officer of the public agency, No objection certificate shall be issued.
Step 6: The nodal officers of public agencies shall upload the NOC/Recommendation within 24 hours of uploading the inspection report. If the NOC/Recommendation is not provided within 3 days of site inspection, it shall be deemed that NOC has been issued by Concerned Public Agency.
For Low Risk Buildings
After receipt of the common Application Form, Authority shall consider the planning and building standard regulations without referring to the public agency. It shall then issue the NOC/recommendation for construction permit.
Checklist of Documents
i) Building Plan Approval
ii) Filled up online Common Application Form
iii) Self-Signed Xerox copies of ownership Documents
iv) Copy of certificate of registration of Architect/Engineers/Builder-Developer
v) Affidavit in original
vi) Scrutiny fee copy
vii) Two Photographs of site.